Sunday, February 17, 2008

Holes in the floor

Think I have the solution to my problem of the 2 holes in the floor of the bathroom. When the concrete cutter was here, there was a lot of rubble left. Can make a bit of a paste with a bit of putty and then fill the hole with that. Let it dry, chisel the tile out and glue another in. Will try this tomorrow.



Last Thursday we started with the quilting group again. We have a pin number to get the key. Tryed it but did not work. The number was changed during the holiday.
Got the right number and opened the room. What a blessing can be a mobile!
Had not much quilting done over the holidays. Hope to do a little bit more over time. However have not finished with the house. There is still a lot more tiles to be removed in the shower. Then the kitchen has to be done. Afterwards a bit of painting.

The mowing is going the right way. Get a lot more done. It is also not raining that much however there are places here in Queensland where they are having floods for instance in Mackay. Coming week there is predicted we are to get more rain, most of this will be very local.

No comments: